| |||||||||||
|
Structural Testing Services Masonry Units, Segmental Pavers and Flags - Methods of Test Report Date: 7/07/2004 Sample Information:
1. Using the test procedure described in AS 4456.16, it proved difficult to maintain the head of water required to conduct the test. 2. The permeability of the test specimens exceeded the flow rate of the water supply into the test fixture calculated to be 24 L/min. Checked by: Craig Cathell
| ||||||||||||||||||||||||||||||||||||||||||||||||
|
Content © 2004 Aqua Solutions | ||||||||||||||||||||||||||||||||||||||||||||||||