Soil erosion solution (Duck Bridge, Esk, QLD)
This project was constructed for the Esk Shire Council on two sides of Duck Creek.
The erosion problem was so severe that it had placed the Duck Bridge structure in jeopardy.
This project rectified the constant soil erosion on the bridge.
Construction time on site: 2.5 days.
Main product/s: Raw Gabi™ Blocks in brown colour.