Water Seepage Solution (Bardon, Brisbane)
This was a design and construct by Aqua Drainage for private contractor, MI Company Pty Ltd.
Having been exposed to very difficult conditions on site with constant water seepage through the bank, conventional systems were unable to be used.
In this design a combination of our Gabi™ Blocks and an Agg drain was used to accommodate the large water flow. Gabi™ Blocks placed in concrete footing.
Construction time on site: 4.5 days.
Main product/s used: Gabi™ Blocks, 50 in total. Artificial Stone finish in Motley Brown Colour. Sealed Graffiti proof Two Pac.
<< Back to projects summary page
|